Cada producto 100Cooling pasa por 5 etapas de control de calidad.
Inspección de Material Entrante
Every batch of stainless steel, ceramic components, and electronic parts undergoes spectrometry analysis, dimensional verification, and material certification checks before entering production.
Control de Calidad en Proceso
Six checkpoints across the production line. CNC tolerances verified to ±0.02mm. Weld integrity tested via dye penetrant inspection. Electrical assemblies undergo functional testing at each stage.
Pruebas de Presión y Rendimiento
100% of pump units tested at 150% rated pressure (225 bar). Every nozzle individually flow-tested. Complete systems run 24-hour continuous operation test with data logging.
Auditoría Final de Calidad
Independent QA team performs full functional verification, cosmetic inspection, packaging integrity check, and documentation review before release.
Inspección Pre-Embarque
Random sampling per AQL 2.5 standard. Export packaging verified for ISTA 3A compliance. All certifications and test reports included with shipment.
Garantía de 5 Años Respaldada por Datos de Calidad
Nuestra tasa de defectos es inferior al 0,3% en todas las líneas de productos.