Misting System Factory: Our Shenzhen Manufacturing Facility

ISO 9001:2015 certified. 8,000 m² production floor. In-house manufacturing from raw material to finished product.

8,000 m²Floor Area
120+ Engineers & TechniciansSkilled Workforce
6 lines, 24/7 operationProduction Lines

Manufacturing Capabilities

CNC precision machining center (5-axis)
Stainless steel welding & fabrication (TIG/MIG)
Ceramic component sintering & laser drilling
Automated assembly lines with QC checkpoints
Hydraulic pressure testing lab (0-200 bar)
Environmental simulation chamber (-20°C to 65°C)
PCB assembly for IoT controllers
Powder coating and surface finishing

Quality Control

100% pressure testing on every pump unit
Individual nozzle flow rate verification
24-hour continuous run-in test for all systems
Material composition spectrometry analysis
Salt spray corrosion testing (ASTM B117)
IP65 ingress protection verification
Electrical safety testing (IEC 60335)
Final QC audit before packaging & shipping

Factory Tour Available

We welcome prospective clients for on-site factory inspections. See our manufacturing process and meet our engineering team.

Schedule a Visit

How an Order Moves Through the Plant

The sequence is the same for a single pump unit or a multi-zone project, which is why a mixed order can ship on one date.

Drawing release
Approved drawings go to the floor with a material schedule. Nothing is machined before sign-off, because a change at this point is free and a change after is not.
Machining and fabrication
Pump manifolds, brackets and enclosures are cut and welded against the schedule. Stainless parts are segregated from mild steel through the whole route to prevent contamination.
Assembly and pressure test
Every unit is assembled, then run at rated pressure before it leaves the line. A pump that leaks at test never reaches a crate, which is cheaper than finding it on site.
Run-in and electrical test
Continuous run-in under load catches seal and control faults that a short pressure test cannot. Electrical safety is verified against the destination market's standard, not a single global one.
Crating and documentation
Packed with the test record, wiring diagram and manual for the configured unit. Consumables are listed so the first service does not wait on a parts enquiry.