Misting System Factory: Our Shenzhen Manufacturing Facility
ISO 9001:2015 certified. 8,000 m² production floor. In-house manufacturing from raw material to finished product.
8,000 m²Floor Area
120+ Engineers & TechniciansSkilled Workforce
6 lines, 24/7 operationProduction Lines
Manufacturing Capabilities
CNC precision machining center (5-axis)
Stainless steel welding & fabrication (TIG/MIG)
Ceramic component sintering & laser drilling
Automated assembly lines with QC checkpoints
Hydraulic pressure testing lab (0-200 bar)
Environmental simulation chamber (-20°C to 65°C)
PCB assembly for IoT controllers
Powder coating and surface finishing
Quality Control
100% pressure testing on every pump unit
Individual nozzle flow rate verification
24-hour continuous run-in test for all systems
Material composition spectrometry analysis
Salt spray corrosion testing (ASTM B117)
IP65 ingress protection verification
Electrical safety testing (IEC 60335)
Final QC audit before packaging & shipping
Factory Tour Available
We welcome prospective clients for on-site factory inspections. See our manufacturing process and meet our engineering team.
Schedule a VisitHow an Order Moves Through the Plant
The sequence is the same for a single pump unit or a multi-zone project, which is why a mixed order can ship on one date.
- Drawing release
- Approved drawings go to the floor with a material schedule. Nothing is machined before sign-off, because a change at this point is free and a change after is not.
- Machining and fabrication
- Pump manifolds, brackets and enclosures are cut and welded against the schedule. Stainless parts are segregated from mild steel through the whole route to prevent contamination.
- Assembly and pressure test
- Every unit is assembled, then run at rated pressure before it leaves the line. A pump that leaks at test never reaches a crate, which is cheaper than finding it on site.
- Run-in and electrical test
- Continuous run-in under load catches seal and control faults that a short pressure test cannot. Electrical safety is verified against the destination market's standard, not a single global one.
- Crating and documentation
- Packed with the test record, wiring diagram and manual for the configured unit. Consumables are listed so the first service does not wait on a parts enquiry.